History

From the moment of its establishment company has been carrying on research and development work, initially independently, then together with Technical Universities from Gdańsk, Warsaw and Lviv.

Company History

We invite you to watch a few videos presenting our company

TWERD ENERGO-PLUS Ltd. — new solutions for power electronics
TWERD ENERGO-PLUS Ltd. — this is how business is done in Toruń
TWERD ENERGO-PLUS Ltd. — employers for the unemployed

How it all started

The beginnings of TWERD ENERGO-PLUS Ltd. date back to 1989 when MSc. Michał Twerd started his activity under the name Zakład Energoelektroniki TWERD.

Starting from DC-drives standard solutions in a short time it worked out and implement frequency converters AFC and MFC series (with one- and three-phase mains).

Our frequency converters can compete with many products available on the market in terms of functionality and reliability. They were presented in 1999 at VIII International Mielec-town Fair and awarded as “the most innovative product of the fair”.

Recently introduced new series of vectorial MFC-710 frequency converters was honored by Prof. Robert Szewalski Grand Prix at TECHNICON 2005 Fair of Science and Technology in Gdańsk.

From the moment of its establishment company has been carrying on research and development work, initially independently, then together with Technical Universities from Gdañsk, Warsaw and Lviv. In cooperation with the Institute of Control and Industrial Electronics (Warsaw University of Technology) we designed vector control of frequency converter with high generated torque at low speed. Applied DTC-SVM method (Direct Torque Control – Space Vector Modulator) provides good dynamic response of drive.

In 2012, the company completed the first stage of the project, which involved the development of six new products:

  • Single-phase frequency converters AFC200 with vector control algorithm;
  • Three-phase MFC1000 inverters with vector control, sinusoidal current consumption, and bi-directional energy flow;
  • PZGS generator sets for energy generation from renewable sources and transmission to the grid (up to 22 kW);
  • Gas fan drive units PZWG;
  • Electric drive for delivery vans FNS;
  • PZGW generators for energy generation and transmission (22–355 kW).

In 2015, as part of the second stage of this project, we completed the construction of a new company building with specialized laboratories and testing stands.

This created opportunities for the implementation of new significant R&D projects, resulting in the creation of new products, including the 3-level, bidirectional AC-DC-AC converter of type MFC910 3.3 kV 0.5-2 MVA, used in the mining industry.

Do you have any questions?

Contact us now!
Write to us

Contact us